The 840 million euro ($1.1 billion) construction of Unit 7 at thermal power plant Tuzla is planned to start in 2012 and be completed in 2017, according to earlier reports in the local media.
Showing posts with label Elektroprivreda BiH. Show all posts
Showing posts with label Elektroprivreda BiH. Show all posts
Tuesday, September 21, 2010
Bosnia to Open Alpiq's Bid in Tender for 450 MW Thermal Power Unit on Oct 1
Bosnia will open on October 1 the sole bid in a prequalification tender for a strategic partner in the construction of a 450-megawatt thermal power unit, which was filed by Switzerland’s Alpiq, power utility Elektroprivreda BiH said on Tuesday.
Subscribe to:
Posts (Atom)
