Bosnia will open on October 1 the sole bid in a prequalification tender for a strategic partner in the construction of a 450-megawatt thermal power unit, which was filed by Switzerland’s Alpiq, power utility Elektroprivreda BiH said on Tuesday.
The 840 million euro ($1.1 billion) construction of Unit 7 at thermal power plant Tuzla is planned to start in 2012 and be completed in 2017, according to earlier reports in the local media.
No comments:
Post a Comment